NEWSFLASH: INTERXION IS REBRANDING TO DIGITAL REALTY. FIND OUT MORE.

33 Chun Choi Street, Tseung Kwan O

  • Uptime Institute Tier III Design and Construction Certified
  • Move-in ready solutions scalable from a few hundred kilowatts to megawatts of power
  • Carrier-neutral connectivity

Worldwide data centre stats

290
+
Data Centres
50
+
Metros
25
+
Countries
6
Continents

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Data Centre Solutions

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Interconnection is at the heart of our data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect

Connectivity

Interconnection is at the heart of our data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect
 

Building Structure

  • 4 stories

Utility Power Capacity

  • 18,000 kW

Total Building Size

  • 200,000 ft²

Flood Risk

  • No risk

UPS Power Capacity

  • 10,960 kW

UPS Redundancy

  • 2N; Distributed Redundant N+1

Max. Power Density

  • 150; 260 for S110 S120 watts/ft²

Generator Power Capacity

  • 19200 for phase 1 and 2 ; 9,600 for phase 3 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • Membrane and Reinforced Concrete Decking

Max. Floor Loading

  • 12.5kN/sqm or 260 lbs/sqft

Security Infrastructure

  • CCTV with 90 day backup
  • Biometric / Photo Badge Access

Compliance Certifications

  • SOC1
  • SOC2
  • SOC3
  • PCI-DSS
  • ISO 9001
  • ISO 14001
  • ISO 27001

Facility Specs

 

Building Structure

  • 4 stories

Utility Power Capacity

  • 18,000 kW

Total Building Size

  • 200,000 ft²

Flood Risk

  • No risk

UPS Power Capacity

  • 10,960 kW

UPS Redundancy

  • 2N; Distributed Redundant N+1

Max. Power Density

  • 150; 260 for S110 S120 watts/ft²

Generator Power Capacity

  • 19200 for phase 1 and 2 ; 9,600 for phase 3 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • Membrane and Reinforced Concrete Decking

Max. Floor Loading

  • 12.5kN/sqm or 260 lbs/sqft

Security Infrastructure

  • CCTV with 90 day backup
  • Biometric / Photo Badge Access

Compliance Certifications

  • SOC1
  • SOC2
  • SOC3
  • PCI-DSS
  • ISO 9001
  • ISO 14001
  • ISO 27001

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Data Centre Solutions

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Interconnection is at the heart of our data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect

Connectivity

Interconnection is at the heart of our data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect
 

Building Structure

  • 4 stories

Utility Power Capacity

  • 18,000 kW

Total Building Size

  • 200,000 ft²

Flood Risk

  • No risk

UPS Power Capacity

  • 10,960 kW

UPS Redundancy

  • 2N; Distributed Redundant N+1

Max. Power Density

  • 150; 260 for S110 S120 watts/ft²

Generator Power Capacity

  • 19200 for phase 1 and 2 ; 9,600 for phase 3 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • Membrane and Reinforced Concrete Decking

Max. Floor Loading

  • 12.5kN/sqm or 260 lbs/sqft

Security Infrastructure

  • CCTV with 90 day backup
  • Biometric / Photo Badge Access

Compliance Certifications

  • SOC1
  • SOC2
  • SOC3
  • PCI-DSS
  • ISO 9001
  • ISO 14001
  • ISO 27001

Facility Specs

 

Building Structure

  • 4 stories

Utility Power Capacity

  • 18,000 kW

Total Building Size

  • 200,000 ft²

Flood Risk

  • No risk

UPS Power Capacity

  • 10,960 kW

UPS Redundancy

  • 2N; Distributed Redundant N+1

Max. Power Density

  • 150; 260 for S110 S120 watts/ft²

Generator Power Capacity

  • 19200 for phase 1 and 2 ; 9,600 for phase 3 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • Membrane and Reinforced Concrete Decking

Max. Floor Loading

  • 12.5kN/sqm or 260 lbs/sqft

Security Infrastructure

  • CCTV with 90 day backup
  • Biometric / Photo Badge Access

Compliance Certifications

  • SOC1
  • SOC2
  • SOC3
  • PCI-DSS
  • ISO 9001
  • ISO 14001
  • ISO 27001

33 Chun Choi St, Sai Kung, Hong Kong - 360 Tour

Video length: 4:02 min

33 Chun Choi St, Sai Kung, Hong Kong - Virtual Tour

Video length: 2:50 min

Hong Kong Information

test

33 Chun Choi Street, Tseung Kwan O
Address: 
33 Chun Choi Street, Tseung Kwan O, Sai Kung, Hong Kong
Phone: +65 65053900

Digital Kin Chuen
Address: 
Kwai Chung, Hong Kong