COVID-19: Our number one priority is the health and safety of our employees and customers. See statement from our CEO.

128 First Avenue

Needham, MA 02494

Located near the Route 95 and Route 90 interchange, the colocation data centre in Boston at 128 First Avenue is a three-story, purpose-built, premier data centre facility with 30 MW of power and 164,000 sq. ft. of raised floor space. Originally built by a telecom company in 2000, this colocation Boston facility has 13 MW of critical IT load that serves a total of 18 customers who are primarily internet based, financial services, and healthcare related companies.

Worldwide data centre stats

284
+
Data Centres
50
+
Metros
26
+
Countries
6
Continents

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Data Centres

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Interconnection is at the heart of Interxion's data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect
  • Metro Connect
  • IP Bandwidth

Connectivity

Interconnection is at the heart of Interxion's data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect
  • Metro Connect
  • IP Bandwidth

Whether you need to move off-premise or connect multiple data centers, Interxion has the reliable solutions for your private and hybrid clouds.

Cloud

Whether you need to move off-premise or connect multiple data centers, Interxion has the reliable solutions for your private and hybrid clouds.

 

Building Structure

  • 3 stories

Utility Power Capacity

  • 30,000 kW

Total Building Size

  • 314,000 ft²

Flood Risk

  • Outside 500 year flood plain

Seismic Rating

  • 2A

UPS Power Capacity

  • 15,000 kW

UPS Redundancy

  • N+1

Max. Power Density

  • 125 watts/ft²

Generator Power Capacity

  • 20,000 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • White TPO membrane roof over insulated 5” lightweight concrete slab

Max. Floor Loading

  • 150 ft²

Security Infrastructure

  • Biometric / Card Access
  • CCTV

Compliance Certifications

  • SOC2
  • SOC3
  • PCI-DSS

Facility Specs

 

Building Structure

  • 3 stories

Utility Power Capacity

  • 30,000 kW

Total Building Size

  • 314,000 ft²

Flood Risk

  • Outside 500 year flood plain

Seismic Rating

  • 2A

UPS Power Capacity

  • 15,000 kW

UPS Redundancy

  • N+1

Max. Power Density

  • 125 watts/ft²

Generator Power Capacity

  • 20,000 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • White TPO membrane roof over insulated 5” lightweight concrete slab

Max. Floor Loading

  • 150 ft²

Security Infrastructure

  • Biometric / Card Access
  • CCTV

Compliance Certifications

  • SOC2
  • SOC3
  • PCI-DSS

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Data Centres

Check out our full list of services including colocation, build to suit, and a focus on sustainability for a complete data centre ecosystem strategy.

  • Data Centre Suites

Interconnection is at the heart of Interxion's data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect
  • Metro Connect
  • IP Bandwidth

Connectivity

Interconnection is at the heart of Interxion's data centres enabling secure, fast, and reliable interconnect connectivity throughout our ecosystem.

  • Cross Connect
  • Metro Connect
  • IP Bandwidth

Whether you need to move off-premise or connect multiple data centers, Interxion has the reliable solutions for your private and hybrid clouds.

Cloud

Whether you need to move off-premise or connect multiple data centers, Interxion has the reliable solutions for your private and hybrid clouds.

 

Building Structure

  • 3 stories

Utility Power Capacity

  • 30,000 kW

Total Building Size

  • 314,000 ft²

Flood Risk

  • Outside 500 year flood plain

Seismic Rating

  • 2A

UPS Power Capacity

  • 15,000 kW

UPS Redundancy

  • N+1

Max. Power Density

  • 125 watts/ft²

Generator Power Capacity

  • 20,000 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • White TPO membrane roof over insulated 5” lightweight concrete slab

Max. Floor Loading

  • 150 ft²

Security Infrastructure

  • Biometric / Card Access
  • CCTV

Compliance Certifications

  • SOC2
  • SOC3
  • PCI-DSS

Facility Specs

 

Building Structure

  • 3 stories

Utility Power Capacity

  • 30,000 kW

Total Building Size

  • 314,000 ft²

Flood Risk

  • Outside 500 year flood plain

Seismic Rating

  • 2A

UPS Power Capacity

  • 15,000 kW

UPS Redundancy

  • N+1

Max. Power Density

  • 125 watts/ft²

Generator Power Capacity

  • 20,000 kW

Cooling Plant Redundancy

  • N+1

Roof Construction

  • White TPO membrane roof over insulated 5” lightweight concrete slab

Max. Floor Loading

  • 150 ft²

Security Infrastructure

  • Biometric / Card Access
  • CCTV

Compliance Certifications

  • SOC2
  • SOC3
  • PCI-DSS

Boston Information

test

105 Cabot Street
Address: 
105 Cabot Street, Needham, MA 02494
Phone: +1 877 378 3282

128 First Avenue
Address: 
128 First Avenue, Needham, MA 02494
Phone: +1 877 378 3282

55 Middlesex Turnpike
Address: 
55 Middlesex Turnpike, Bedford, MA 01730
Phone: +1 877 378 3282